Hot blast furnace owners manual






















forced air upflow-type central furnace, or it may be installed as a central furnace. 1. Check your local codes. The installation must comply with their rulings. 2. Do not install this furnace in a mobile home or trailer. 3. Always connect this furnace to a chimney and vent to the outside. Never vent to another room or inside a building. 4. This furnace can be installed in three ways, as a stand alone unit, parallel, and in series with an existing furnace. SUPPLY AIR (HOT AIR) PLENUM The warm-air supply duct shall be constructed of metal in accordance with NFPA 90B, The plenums installed to the furnace shall be constructed of metal in accordance with NFPA 90B, Place (1) one 1/ X 3/4 bolt into the servo arm and secure with (1) one washer and (1) one 1/ lock nut as shown. Insert the servo arm into the actuator. STEP 4. Attach the actuator to the unit by inserting (2) two 24 X 1/2 screws into the pre-drilled holes located on the upper right side of the unit.


Rules for Connector Pipe Installation 1. The crimped end of the chimney connector fits inside the furnace flue collar. Install additional chimney con- nectors and elbow with the CRIMPED END TOWARD THE FURNACE. This will allow any condensation in the flue to run back into the furnace. Use 6" dia. steel pipe and elbows for connection to chimney. Place (1) one 1/ X 3/4 bolt into the servo arm and secure with (1) one washer and (1) one 1/ lock nut as shown. Insert the servo arm into the actuator. STEP 4. Attach the actuator to the unit by inserting (2) two 24 X 1/2 screws into the pre-drilled holes located on the upper right side of the unit. This furnace can be installed in three ways, as a stand alone unit, parallel, and in series with an existing furnace. SUPPLY AIR (HOT AIR) PLENUM The warm-air supply duct shall be constructed of metal in accordance with NFPA 90B, The plenums installed to the furnace shall be constructed of metal in accordance with NFPA 90B,


NOTE: Should you wish to in- stall a domestic hot water coil, it should be secured to the right side prior to assembly. Also, the rear cast iron baffle must be. In keeping with these cerning hot blast stove automatic control systems are trends, heat consumption in hot Independent manual operation of each valve. The blower must be kept running to disperse excessive heat. 2) Manually close the damper door by unhooking the chain. 3) Check controls for proper operation.

0コメント